Amazon Interview Questions

Review this list of 391 Amazon interview questions and answers verified by hiring managers and candidates.
  • +18

    "I will use below 4 pillars to rate and prioritize those 5 projects: Analyze the impact of those 5 projects, to our team and to the whole company maybe Find out if those 5 projects have any dependency between each other Clarify the timeline of each project Identity the status of resources to work on those 5 projects and also the status of their dependencies"

    Dean Z. - "I will use below 4 pillars to rate and prioritize those 5 projects: Analyze the impact of those 5 projects, to our team and to the whole company maybe Find out if those 5 projects have any dependency between each other Clarify the timeline of each project Identity the status of resources to work on those 5 projects and also the status of their dependencies"See full answer

    Software Engineer
    Behavioral
  • Amazon logoAsked at Amazon 
    +1

    " To clarify on what we are trying to solve for and get the definition of a distributed scheduler straight . So A Distributed Scheduler refers to a system that can handle job scheduling and execution in a scalable and fault-tolerant manner by distributing the workload across multiple servers or nodes. we will make some assumptions with the design , as follows: we will assume 10,000 QPS for job submissions and should be able query for jobs status . Job execution should have minimal latency"

    Scott S. - " To clarify on what we are trying to solve for and get the definition of a distributed scheduler straight . So A Distributed Scheduler refers to a system that can handle job scheduling and execution in a scalable and fault-tolerant manner by distributing the workload across multiple servers or nodes. we will make some assumptions with the design , as follows: we will assume 10,000 QPS for job submissions and should be able query for jobs status . Job execution should have minimal latency"See full answer

    Software Engineer
    System Design
    +1 more
  • Amazon logoAsked at Amazon 
    +2

    "Step 1: Clarifying the Problem Scope We will focus on designing the leaderboard for Dream11 with these assumptions: Registered teams: 100,000 users are actively participating and ranked. Real-time updates: Leaderboard updates frequently as players accumulate points based on live sports events. Multiple leagues: Each user can participate in different leagues, so we will need to maintain a separate leaderboard for each league. Query efficiency: Users frequently"

    Ramendra S. - "Step 1: Clarifying the Problem Scope We will focus on designing the leaderboard for Dream11 with these assumptions: Registered teams: 100,000 users are actively participating and ranked. Real-time updates: Leaderboard updates frequently as players accumulate points based on live sports events. Multiple leagues: Each user can participate in different leagues, so we will need to maintain a separate leaderboard for each league. Query efficiency: Users frequently"See full answer

    Engineering Manager
    System Design
  • +10

    "Disagreement --> persistent ---> more data insights ---> positive relationship ---> mentor/trust"

    Sam - "Disagreement --> persistent ---> more data insights ---> positive relationship ---> mentor/trust"See full answer

    Product Manager
    Behavioral
  • Amazon logoAsked at Amazon 
    +8

    "I firstly discuss the brute force approach in O(n^2) time complexity , than i moved to O(nlogn) tine complexity than i discussed the O(n) time complexity and O(n) space complexity . But interviewer want more optimised solution , in O(n) time complexity without using extra space , The solution wants O(1) space complexity i have to do changes in same array without using any space . This method is something like i have to place positive values to its original position by swapping and rest negativ"

    Anni P. - "I firstly discuss the brute force approach in O(n^2) time complexity , than i moved to O(nlogn) tine complexity than i discussed the O(n) time complexity and O(n) space complexity . But interviewer want more optimised solution , in O(n) time complexity without using extra space , The solution wants O(1) space complexity i have to do changes in same array without using any space . This method is something like i have to place positive values to its original position by swapping and rest negativ"See full answer

    Software Engineer
    Data Structures & Algorithms
    +1 more
  • 🧠 Want an expert answer to a question? Saving questions lets us know what content to make next.

  • +1

    "Found bug will not impact on the new requirements, if the engineering team aware of the source of the bug and the severity, than it can easily be handled and regression test to perform for a quality check. The new requirement should be equally prioritize for groom and start creating task and team to work on it. Finally based on the severity of the bug you can shuffle the resources between these items."

    Jagat mohan B. - "Found bug will not impact on the new requirements, if the engineering team aware of the source of the bug and the severity, than it can easily be handled and regression test to perform for a quality check. The new requirement should be equally prioritize for groom and start creating task and team to work on it. Finally based on the severity of the bug you can shuffle the resources between these items."See full answer

    Technical Program Manager
    Program Sense
  • +2

    "select employeename, employeeid, salary, department, DR from ( select employeename, employeeid, salary, dense_rank() over (partition by department order by salary desc) DR, department from employee ) where DR <=3 order by department, DR"

    Sreeram reddy B. - "select employeename, employeeid, salary, department, DR from ( select employeename, employeeid, salary, dense_rank() over (partition by department order by salary desc) DR, department from employee ) where DR <=3 order by department, DR"See full answer

    Data Engineer
    Coding
    +1 more
  • +10

    "There are way more learning opportunities for us here if we acknowledge that this was not a good example and provide tips on how to improve the answer. All the answers here are superficial and it is clear that the interviewee was unprepared. . The mention of quote "a wise man told me..." (instead of getting to his own personal points) and some lack of confidence with the metrics portion are red flags. . For more concrete example, it is hard to believe that no one wants to fix the slow build proc"

    Danny - "There are way more learning opportunities for us here if we acknowledge that this was not a good example and provide tips on how to improve the answer. All the answers here are superficial and it is clear that the interviewee was unprepared. . The mention of quote "a wise man told me..." (instead of getting to his own personal points) and some lack of confidence with the metrics portion are red flags. . For more concrete example, it is hard to believe that no one wants to fix the slow build proc"See full answer

    Behavioral
  • Amazon logoAsked at Amazon 
    +53

    "I follow a variation of the RICE framework when prioritizing how I ship product features. I start by looking at: Reach: Because the customer segmentation across our product portfolio is so similar, I tend to hold a lot of weight on product features that will maximize our customer reach with a minimal LOE. Impact: After establishing which customer segments will benefit from the product feature, I determine the urgency and estimated impact on each customer segment based on customer i"

    Ashley C. - "I follow a variation of the RICE framework when prioritizing how I ship product features. I start by looking at: Reach: Because the customer segmentation across our product portfolio is so similar, I tend to hold a lot of weight on product features that will maximize our customer reach with a minimal LOE. Impact: After establishing which customer segments will benefit from the product feature, I determine the urgency and estimated impact on each customer segment based on customer i"See full answer

    Product Manager
    Behavioral
    +8 more
  • Amazon logoAsked at Amazon 
    +1

    "I tried solving this problem and here is the recorded video for the answer. https://www.youtube.com/watch?v=d1tOkeQjyI4 And here is the link to Excalidraw board - https://excalidraw.com/#json=uabNFHcZm5qNh8CInMvyh,Wn9Vf1ZhGdl_iBCQYFkYdw"

    Rjj - "I tried solving this problem and here is the recorded video for the answer. https://www.youtube.com/watch?v=d1tOkeQjyI4 And here is the link to Excalidraw board - https://excalidraw.com/#json=uabNFHcZm5qNh8CInMvyh,Wn9Vf1ZhGdl_iBCQYFkYdw"See full answer

    Engineering Manager
    System Design
    +1 more
  • Amazon logoAsked at Amazon 
    Video answer for 'How would you initiate a new program from scratch?'
    +67

    "This by far has been the best interview I've seen so far, granted I've watched 15 mock interviews. Great Job!"

    Kell K. - "This by far has been the best interview I've seen so far, granted I've watched 15 mock interviews. Great Job!"See full answer

    Program Sense
    Analytical
    +1 more
  • +5

    "Functional Requirement Ingest Book Reviews in real time User in the website needs specify title tho search books, return response is the list of reviews on the books. Non Functional Requirement: User get real-time book reviews> It nees to handle the search among 1 million of active users daily"

    Simon O. - "Functional Requirement Ingest Book Reviews in real time User in the website needs specify title tho search books, return response is the list of reviews on the books. Non Functional Requirement: User get real-time book reviews> It nees to handle the search among 1 million of active users daily"See full answer

    Software Engineer
    System Design
    +1 more
  • "We were working on a very high stake migration project where were suppose to migrate all the traffic (more than 40 million users per day) from legacy to modern micro-services based architecture. Before making this massive migration decision, company has already developed a lot of services outside monolith and we were suppose to utilise those services. Some these services there were PADs responsible to communicate the specific vendor APIs. For each vendor we had a dedicated PAD. Fast forward"

    Mohammad shahid S. - "We were working on a very high stake migration project where were suppose to migrate all the traffic (more than 40 million users per day) from legacy to modern micro-services based architecture. Before making this massive migration decision, company has already developed a lot of services outside monolith and we were suppose to utilise those services. Some these services there were PADs responsible to communicate the specific vendor APIs. For each vendor we had a dedicated PAD. Fast forward"See full answer

    Product Manager
    Behavioral
    +1 more
  • Amazon logoAsked at Amazon 
    +4

    "I: Design a banking app for kids S: Sure, let me start with clarifying questions. What is our goal for building this app? I: To create financial literacy early in childhood and also increase our customer base. S: Sure. Are we going to launch it globally or in any specific geography or demography? I: Globally. S: Sure, Any resource or time constraints to keep in mind because I need to prioritize the features on the roadmap based on that? Also, are we launching it on iOS or Android? I: No resource"

    Sameer S. - "I: Design a banking app for kids S: Sure, let me start with clarifying questions. What is our goal for building this app? I: To create financial literacy early in childhood and also increase our customer base. S: Sure. Are we going to launch it globally or in any specific geography or demography? I: Globally. S: Sure, Any resource or time constraints to keep in mind because I need to prioritize the features on the roadmap based on that? Also, are we launching it on iOS or Android? I: No resource"See full answer

    Product Manager
    Product Design
  • Amazon logoAsked at Amazon 
    Video answer for 'Tell me about a time when you improved a complex process.'
    +9

    "This is the answer I have prepared. Please let me know your comments and how I can improve the answer. I have worked on many process improvement initiatives and projects. I want to share an initiative that I led and delivered while at my previous employer. It had a great impact on over 60 programs and projects across teams in six different countries. Analysts and program managers used to generate a monthly program performance report that deals with all aspects, including schedule, risks, costs"

    Balaji G. - "This is the answer I have prepared. Please let me know your comments and how I can improve the answer. I have worked on many process improvement initiatives and projects. I want to share an initiative that I led and delivered while at my previous employer. It had a great impact on over 60 programs and projects across teams in six different countries. Analysts and program managers used to generate a monthly program performance report that deals with all aspects, including schedule, risks, costs"See full answer

    Behavioral
    Project Management
  • Amazon logoAsked at Amazon 

    "It was like say we have a library A which has a library B as a dependency and so on, how would we determine in the dependency chain that whether there is a circular depedency?"

    Chris R. - "It was like say we have a library A which has a library B as a dependency and so on, how would we determine in the dependency chain that whether there is a circular depedency?"See full answer

    Software Engineer
    Coding
    +1 more
  • Amazon logoAsked at Amazon 
    Video answer for 'Tell me about a time when you faced technical and people challenges simultaneously.'
    +5

    "How often do we get 15 min to answer a question? Wondering isn't the expectation to answer this in 3-5 min?"

    Anonymous Raven - "How often do we get 15 min to answer a question? Wondering isn't the expectation to answer this in 3-5 min?"See full answer

    Product Manager
    Behavioral
    +1 more
  • Amazon logoAsked at Amazon 
    +3

    "In my role as a Product Owner, I was developing a platform for a logistics company. As a PO and that too of a digital agency, my work was mostly before-end-to-after-end, it would start from pitching, strategy, product management, launch, funding deck prep. In mid of the product management cycle, the client starts adding pressure to deliver way before the deadline, as they had found the PE firm that conceptually was ready to start funding discussion, since this was not scoped before the start,"

    Umang S. - "In my role as a Product Owner, I was developing a platform for a logistics company. As a PO and that too of a digital agency, my work was mostly before-end-to-after-end, it would start from pitching, strategy, product management, launch, funding deck prep. In mid of the product management cycle, the client starts adding pressure to deliver way before the deadline, as they had found the PE firm that conceptually was ready to start funding discussion, since this was not scoped before the start,"See full answer

    Product Manager
    Behavioral
  • "Batch Packing Problem In Amazon’s massive warehouse inventory, there are different types of products. You are given an array products of size n, where products[i] represents the number of items of product type i. These products need to be packed into batches for shipping. The batch packing must adhere to the following conditions: No two items in the same batch can be of the same product type. The number of items packed in the current batch must be strictly greater than the number pack"

    Anonymous Goat - "Batch Packing Problem In Amazon’s massive warehouse inventory, there are different types of products. You are given an array products of size n, where products[i] represents the number of items of product type i. These products need to be packed into batches for shipping. The batch packing must adhere to the following conditions: No two items in the same batch can be of the same product type. The number of items packed in the current batch must be strictly greater than the number pack"See full answer

    Software Engineer
    Coding
    +1 more
  • Amazon logoAsked at Amazon 
    +8

    "I will divide my answer in 2 parts: Process I use for managing risks in any Project I will explain a real life situation where a Risk occurred and how I managed it Process for Risk Management can be broken down into 3 parts: Risk Identification: Risk identification is a team effort and is an ongoing process that happens throughout the Project. Technical Risks are usually identified during design/build/testing stage. I maintain a Risk register document to capture all the risks identified"

    Saket S. - "I will divide my answer in 2 parts: Process I use for managing risks in any Project I will explain a real life situation where a Risk occurred and how I managed it Process for Risk Management can be broken down into 3 parts: Risk Identification: Risk identification is a team effort and is an ongoing process that happens throughout the Project. Technical Risks are usually identified during design/build/testing stage. I maintain a Risk register document to capture all the risks identified"See full answer

    Technical Program Manager
    Behavioral
    +3 more
Showing 41-60 of 391